How much time do I have once the permit is issued?

Permits expire and become null and void if work is not started and an inspection requested within 180 days from the issuance date of the permit. After work has begun the permit will expire when work is suspended or abandoned for a period of 180 days. Lack of an approved inspection within this time will serve as validation that the job has been suspended or abandoned. Approved inspections will extend the permit six (6) months. An extension may be granted if a written request is submitted to the Building Division for review.

Show All Answers

1. What Building Codes are being used?
2. Why do I need a permit?
3. When is a permit required?
4. How much will my permit cost?
5. What happens if I choose not to obtain the required permits?
6. Do I need a contractor?
7. If I use a contractor, what should I know to choose one?
8. How long does it take to get a permit?
9. What happens after the permit is issued?
10. How much time do I have once the permit is issued?
11. Where is the Permitting office located?
12. What do I need in order to obtain a permit?
13. When may I start building?
14. When do I need inspections?
15. Can I change my mind about the way something looks or is done?
16. How long is a permit active?
17. Does the City require an approval letter from a condominium or homeowners association?
18. What types of exterior projects require a permit?
19. What is an Impervious Calculation Worksheet?
20. What types of interior projects require a building permit?
21. Is a permit required to install a heat pump or air-conditioning unit?
22. Is a permit required to install a new outlet, ceiling fan, or lighting fixture?
23. Is a permit required to install a new sink, toilet or hot water heater?
24. Do I need a garage/estate sale permit and what are the requirements for having a garage/estate sale?