City of Winter Garden, FL

Home | Resident | Business | Visitor | City Hall | Public Safety |

A charming little city with a juicy past

Capital Improvements

Capital Improvement Projects

City of Winter Garden
300 West Plant Street
Winter Garden, FL 34787
Phone: 407.656.4111

Staff

Donald R. Cochran, Assistant City Manager – Public Services
dcochran@wintergarden-fl.gov
Phone: 407.656.4111 ext. 2263

Arthur R. Miller, III, P.E., P.L.S.
City Engineer
amiller@wintergarden-fl.gov
Phone: 407.656.4111 ext. 2261

 

Construction of the below-listed projects is either currently underway, scheduled to begin in the coming months, or recently completed. Roadway closures associated with these projects are announced on the homepage of the City’s website. Please contact the Engineering Division of the Public Services Department for further information.

 

PROJECT

START DATE

FINISH DATE

Woodlark Well
Construction of a lower Floridian aquifer production well, as well as the installation of a well pump and motor, piping modifications, and electrical and instrumentation improvements.

May 2014

June 2015

Crest Avenue WWTP Screening and Odor Control Improvements
This project will replace the existing mechanical bar screens and implement odor control improvements at the City’s wastewater treatment plant.

July 2014

May 2015

Reuse Distribution Retrofit
Expansion of the existing reuse water service to three subdivisions in the Stoneybrook West community (Lakehurst, Pebble Ridge, and Fox Hunt) as well as the extension of the reuse water main along Tilden.

Aug. 2014

August 2015

CR 545 Reuse Main Extension
Extension of a 16-inch reuse main along CR 545 from the Florida Turnpike to SR 50.

Jan 2015
Aug 2016

Two Inch Water Main Replacement
Replacement and abandonment of the two-inch backyard water mains from Winter Street to Summer Street along East Maple Street, Florida Avenue, and Pennsylvania Avenue. Service relocation is included.

June 2015
Oct 2015

Avalon Road and Tilden Road Temporary Traffic Signal
Installation of a temporary traffic signal along with turn lanes and a swale drainage system.

July 2015
Oct 2016

Stoneybrook Parkway and CR 535 Turn Lane Extension
Extension of the right turn lane, northbound onto CR 535 with water main and stormwater relocation work.

Aug 2015
Dec 2016

Avalon Road and Tilden Road Reconstruction
Reconstruction of the intersection including the water main, reuse main, and stormwater lines. Realignment of the roadway and the installation of a new traffic signal at Avalon Road and Tilden Road as well as at Avalon Road and Marsh Road.

Sept 2015
July 2016

Woodlark Water Tank
Construction of a one million gallon potable water storage tank, related plant piping, and expansion of the hypochlorite facility.

Sept 2015
June 2016

Park Avenue Drainage Improvements
Replacement of the stormwater system along Park Avenue from Story Road to Plant Street. Replacement of the water main from Jackson Street to Story Road. Milling and resurfacing work from Jackson Street to Plant Street.

Aug. 2016

Dec 2016

Last updated 7/29/2015